|
|
Company
- Founded in 1989.
- Policy of high quality and economy design.
- Application of modern structural systems.
- Extensive use of advanced structural analysis and design software.
-
Professional staff well acquainted with American and international codes and standards,
ACI, AISC, AASHTO codes, Eurocode, BSI requirements and fib recommendations.
- Demonstrated capabilities for production under time constraints.
-
The company's quality management system is approved according to the requirements of
ISO 9001, 2000.
-
Accurate analysis and design. Any structure from large bridges to culverts is analyzed by
a computerized model of the entire structure as a whole including foundation/soil interaction.
- Dynamic and second order analyses are performed where ever required.
This investment in any project ensures safe and economic design, long life,
good performance and crack free structures.
Proficiency in the design of Spliced Girder Bridges and developing a unique method for optimization
of post tension tendon profile. Capitalizing on this expertise, the company provides design of spliced
girder bridges as the most economical technique for 40 to 80 meters span and with the greatest span/depth
ratio for bridges composed of precast elements.
Knowledge and many years of experience and research on the effect of creep, shrinkage, temperature
differences and the structure foundation/soil interaction. This enables the company to design long
integral bridges, meaning no expansion joints, no elastomer or mechanical bearings- increasing riding
quality and reducing significantly maintenance cost.
The company designed over 1,000,000 square meters of post-tensioned slabs with bonded and
unbonded tendons up to 30 meters clear span. The company provides this very economic and fast
construction system, including one and two ways slabs, transfer slabs, large slabs on grade without
joints, round and rectangular tanks and pools.
|
|